Superior Clay Catalog 2014 - page 11

9
Building theLargeorModifiedRumford
SuperiorClayCorporationmasonryRumford fireplaces aredesigned tohelpyoubuild thebest fireplaces
available—systematically, quicklyandprofitably.
Build theRumfordFireboxbackedupwithsolidmasonry to the topof theopening. Continue to layblock
12.5" above theopening tosupport theanglewhichcarries the throat sections.
Set the throat andcontinue tobuildthe fireboxandsurroundingmasonry,beingcareful toget thecorrect
throatopeningdepth.Thencover the throatopeningwiththedamper, set thesmokechamber, surroundit
withmasonryandstart stacking flues for thechimney.
RECOMMENDEDSPECS
Fireplace Throat
Coving
Min.Damper
Damper
Smoke
Width Sections
Section
Throat
Frame
Chamber
36"
3 1Left,1Right
20"x4"
9"x24"
13"x13"
42"
3.5 1Left,1Right 23.5"x4.5"
9"x30"
13"x18"
48"
4 1Left,1Right
27.5"x5"
9"x30"
16"x20"
60"
5 1Left,1Right
10"x42"
42"dome 20"x20"
72"
6 1Left,1Right
10"x48"
48"dome 24"x24"
Note:Designsandcomponent lists for other sizesareavailableat ourweb
site or bycallingusat800-848-6166.
Smoke chambersareavailable either straight or offset for all sizes.
SmokeChamber
Flue
Coving
Damper
Damper
Throat
1...,2,3,4,5,6,7,8,9,10 12,13,14,15,16,17,18,19,20,21,...46
Powered by FlippingBook